Here is my timeline for the entire process I went through including both MEBs.
Tore my ACL during PT playing football at work. ( not originally diagnosed as a torn ACL, just a sprain)
(Jan 06)
Physical Therapy which had no effect and actually made my knee worse.
(Jan 06)
Finally after several visits to te clinic sent to Orthopedic Dr.
(Apr 06)
Ortho Dr says after 1st visit, you have an ACL tear and scheduled surgery.
(Apr 06)
Surgery done on my knee and placed on Con leave.
(Apr 06- May 06)
Returned to work with limitations.
(May 06) MEB started after no improvement on my knee and the pain i was in.
(Apr 07) MEB kicked back from IPEB because ROM and Drs note were outdated.
(Jun 07)
MEB resent to IPEB after documents are corrected.
(Jul 07)
8 weeks later find out IPEB never received the new package.
(Sep 07)
Package put together a 3rd time, only not all info was included that needed to bed.
(Oct 07) ( i had no idea what to even look for. Had yet to find this site at that time.)
2 weeks after 3rd package was put together I received a RTD. Never even went to IPEB.
(Oct 07)
Returned to duty but yet still cant perform my duties as a firefighter, so I am placed in the 911 dispatch center.
(Oct 07)
Rupture my L4-L5 disc in my back.
(Jan 08)
Get refferal to get an MRI and Neurologist
(Feb 08)
1st discectomy surgery
(Feb 08)
Con leave
(Feb 08 - Mar 08)
Pain is now worse than before surgery
(Mar 08)
Neruosurgeon schedules 2nd surgery end of Mar
(Mar 08)
Con Leave
(Mar 08 - May 08)
Released from Drs care back to base after 2nd surgery showed no improvement and he stated nothing further could be done surgically.
(May 08)
back to work in the 911 dispatch center
(Jun 08)
Had a breakdown and went to chaplin and mental health
(Jul 08)
PCM, initiates 2nd
MEB, this time for my back and mental health.
(Jul 08)
PCM also refers me off base to have sleep study done.
(Jul 08)
Sleep study done and found to have sleep apnea.
(Jul 08)
Sent down to Camp Lejune for mental health portion of
MEB due to the one at SJAFB being deployed.
(Aug 08) MEB package finished and sent off to AFPC.
(26 AUG 08)
Attended mandatory presepartion briefing.
(25 Sep 08)
Received my IPEB results 40% TDRL.
(6 Oct 08)
Attended 3 day TAPS briefings.
(7,8,9 Oct 08)
Received my retirement orders for Retirement date of 24 Nov 08.
(15 Oct 08)