Remote MEB Timeline

Discussion in 'Army Case Timelines' started by BCWhite, Sep 27, 2011.

  1. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    23 AUG 11 Was referred to MEB after my profile was elevated from P2 to P3. Profile is for Degenerative Joint Disease Lumbar Spine with Herniation L5-S1.

    06 SEP 11 PEBLO contacted me from Fort Gordon, I am in Mississippi (9 hours away). My MEB will be processed through Gordon, guess I get some TDY. Talked over process and mailed me forms to complete and send back.

    12 SEP 11 Filled out and faxed forms back to PEBLO.

    27 SEP 11 Contacted by VA MSC at Fort Gordon. She requested I copy my medical records as she said the one given to her was less than 20 pages. Gave her my laundry list of "problems":
    DJD Lumbar Spine with Herniation L5-S1
    Ulnar Nerve Impingement (Surgery pending early October)
    PTSD
    Acid Reflux
    Memory Loss/ Concentration Problems
    Sleep Disturbances (Waiting on referral for sleep study)
    Bilateral Heel Pain
    Tinitus/ Ringing in ears
    Mild hearing loss
    Bilateral Knee Pain
    Bilateral Shoulder Pain

    Thats where I sit, will keep you posted on the length of this process. I have a feeling I'll do "OK" with disability. Keep the faith guys.
  2. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    An update to my MEB. As of 22 DEC 11 I am awaiting the NARSUM. It's been really frustrating being two states away from my PEBLO. I feel like I am getting a disservice being so far away. I hit 20 years active federal service next month, so I am assuming when the board does meet they will just recommend retirement.
  3. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    25 January- MEB Complete.
    27 January Received packet from Fort Gordon. A little confused about some things and there are some errors. Researching.
  4. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Talked to my VA service rep today. She stated that VA awarded me 100% on May 12. She told me this information was sent to the PEB and that is what they were waiting on to complete my PEB process. Hopefully soon I will get some information from the Army, my PEBLO never has any information. Trying to figure out what 100% means now.
  5. Skyracer930

    Skyracer930 Member

    Joined:
    Feb 9, 2012
    Messages:
    63
    Trophy Points:
    8

    They were able to tell you your percentage? They tell me they can't even though its right in front of them
  6. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Sorry, yes she told me the total percentage. I haven't received anything in writing as of yet. So, I am not getting my hopes up. Board is still in PEB phase as of 3/20/2012.
  7. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    VA sent rating to PEB on May 12, 2012. So I expect about 6 weeks for results from PEB.
  8. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    AKO was populated today with a PEB completion date of 5/22. So it looks like it is moving along. PEBLO didn't answer the phone today so I will try to call him tomorrow.
  9. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Updated:

    P3 Profile Issued: 23 AUG 2011
    MEB referral: 23 AUG 2011
    Phone Counsel with PEBLO: 13 SEP 2011
    Phone Interview with VA: 14 SEP 2011
    C&P Exams with VA contractor: 04 OCT 2011
    Commanders Statement signed: 11 NOV 2011
    MEB Signed: 22 DEC 2011
    Packet received by PEB at FSH TX: 20 MAR 2012
    VA Ratings returned: 12 MAY 2012
    Unfit findings by PEB: 22 MAY 2012 (2 months, really?)
    199 signed: ?
    Transition orders received: ?

    FINAL OUT OF THE ARMY: ?
  10. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Today, AKO populated with a TDRL Physical Date of Feb 2013. Still no "Official" word from my PEBLO.
  11. Joe Spado

    Joe Spado New Member

    Joined:
    Mar 22, 2012
    Messages:
    11
    Trophy Points:
    3
    My updated timeline as of 7 JUN 12

    Refered to MEB (IDES) for MS DEC 11
    VA Physical 12 Jan 12
    NARSUM Complete 28 Apr 12
    MEB Packet forwarded to PEB (second time) 7 May 12
    After bugging my PEBLO she told me that my packet was forwarded to DVA on or about 3 JUN 12
    Awaiting their findings and then the 199 for me to review and sign. My PEBLO is clueless. She did not know what I was going to the PEB for nor did she realize that once the PEB sends your case to DVA it means that you were found unfit. Or maybe I am missing something but I do not think that I am. My PEB was conducted at WWAMC and my VA location for adjudication is Seatle, WA if that helps anyone.

    My best advice after all of this is BE PERSISTENT! Call not just your PEBLO but the PEB board as well. That is the only way to make this non-transparant process a little less nerve wracking.
  12. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    I called my PEBLO today, my PEB results are on their way to me VIA FEDEX. I should have them tomorrow or monday, along with my 199. Anxious now.
  13. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Updated:



    Got my PEB in hand today, 70% DA and 100% VA, placed on TDRL. I'm excited. Anyone know how long it takes from 199 to Orders?​
  14. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Updated:

    P3 Profile Issued: 23 AUG 2011
    MEB referral: 23 AUG 2011
    Phone Counsel with PEBLO: 13 SEP 2011
    Phone Interview with VA: 14 SEP 2011
    C&P Exams with VA contractor: 04 OCT 2011
    Commanders Statement signed: 11 NOV 2011
    MEB Signed: 22 DEC 2011
    Packet received by PEB at FSH TX: 20 MAR 2012
    VA Ratings returned: 12 MAY 2012
    Unfit findings by PEB: 22 MAY 2012 (2 months, really?)
    199 signed: 11 June 2012
    199 Sent back to PEB: 13 June 2012
    Case forwarded from PEB to PDA: 19 June 2012
    Orders Received: ?
    Retirement: ?
  15. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Updated:

    IDES is supposed to take no more than 292 days.

    P3 Profile Issued: 23 AUG 2011
    MEB referral: 23 AUG 2011
    Phone Counsel with PEBLO: 13 SEP 2011 (21 Days)
    Phone Interview with VA: 14 SEP 2011 (22 Days)
    C&P Exams with VA contractor: 04 OCT 2011 (42 Days)
    Commanders Statement signed: 11 NOV 2011 (80 Days)
    MEB Signed: 22 DEC 2011 (121 Days)
    Packet received by PEB at FSH TX: 20 MAR 2012 (210 Days)
    VA Ratings returned: 12 MAY 2012 (263 Days)
    Unfit findings by PEB: 22 MAY 2012 (273 Days)
    199 signed: 11 June 2012 (293 Days)
    199 Sent back to PEB: 13 June 2012 (295 Days)
    Case forwarded from PEB to PDA: 19 June 2012 (301 Days)
    PEB Results received at PDA: 25 June 2012 (307 days)
    Orders Received: ?
    Retirement: ?
  16. BCWhite

    BCWhite PEB Forum Regular Member

    Joined:
    Jul 21, 2011
    Messages:
    58
    Trophy Points:
    8
    Updated:

    IDES is supposed to take no more than 292 days.

    P3 Profile Issued: 23 AUG 2011
    MEB referral: 23 AUG 2011
    Phone Counsel with PEBLO: 13 SEP 2011 (21 Days)
    Phone Interview with VA: 14 SEP 2011 (22 Days)
    C&P Exams with VA contractor: 04 OCT 2011 (42 Days)
    Commanders Statement signed: 11 NOV 2011 (80 Days)
    MEB Signed: 22 DEC 2011 (121 Days)
    Packet received by PEB at FSH TX: 20 MAR 2012 (210 Days)
    VA Ratings returned: 12 MAY 2012 (263 Days)
    Unfit findings by PEB: 22 MAY 2012 (273 Days)
    199 signed: 11 June 2012 (293 Days)
    199 Sent back to PEB: 13 June 2012 (295 Days)
    Case forwarded from PEB to PDA: 19 June 2012 (301 Days)
    PEB Results received at PDA: 25 June 2012 (307 days)
    Orders Received: 12 July 2012 (324 days)
    Start Term Leave/PTDY: 21 July 2012
    Retirement: 6 Oct 2012
  17. adonis06

    adonis06 PEB Forum Regular Member

    Joined:
    Mar 25, 2012
    Messages:
    39
    Trophy Points:
    23
    Congratulations on your retirement!! If you had over 20 years of active federal service, why did they place you on TDRL instead of PDRL?

Share This Page