Ongoing and I'll spare the details of everything, but if you are interested in any of them here are some links:
"So Many Questions"
"Burn Pit Respiratory update"
"Need Some Serious Help"
"PEBLO not performing their duty"
But onto the progress...
HISTORY: (Case is for asthma, which has been worsening throughout the whole process)
07/2010 - Fast Track MEB Initiated after wheezing heard and initial dx of asthma.
01/2011 - Results received. Fit for duty. C2 Code.
03/2012 - RILO ALC-C2. Next RILO due in 6 months.
02/2013 - RILO ALC-C2. Next RILO due in 6 months (Full MEB if not controlled).
08/2013 - RILO. Put on 3 month Military Medical Observation. AAC 37 started. Next RILO due in 3 months.
Stated they needed copies of 4 documents they had received with my RILO. Would not review.
08/2013 - Congressional Inquiry Requested
12/2013 - RILO. Fit (magically. No medical observation or anything but ER visits). Next RILO due in 6 months. ALC-C2 (Full MEB if not controlled).
09/2014 - RILO rejected. Full MEB requested with required submission to IPEB.
MEB TIMELINE:
09/08/14 - Met with PEBLO and signed for MEB
09/17/14 - Initial brief with MSC
10/06/14 - VA Pulmonary Function Test
10/09/14 - C&P Exams
11/14/14 - Reviewed NARSUM, opted for Letter of Exception (LOE)
11/18/14 - Turned in LOE
"So Many Questions"
"Burn Pit Respiratory update"
"Need Some Serious Help"
"PEBLO not performing their duty"
But onto the progress...
HISTORY: (Case is for asthma, which has been worsening throughout the whole process)
07/2010 - Fast Track MEB Initiated after wheezing heard and initial dx of asthma.
01/2011 - Results received. Fit for duty. C2 Code.
03/2012 - RILO ALC-C2. Next RILO due in 6 months.
02/2013 - RILO ALC-C2. Next RILO due in 6 months (Full MEB if not controlled).
08/2013 - RILO. Put on 3 month Military Medical Observation. AAC 37 started. Next RILO due in 3 months.
Stated they needed copies of 4 documents they had received with my RILO. Would not review.
08/2013 - Congressional Inquiry Requested
12/2013 - RILO. Fit (magically. No medical observation or anything but ER visits). Next RILO due in 6 months. ALC-C2 (Full MEB if not controlled).
09/2014 - RILO rejected. Full MEB requested with required submission to IPEB.
MEB TIMELINE:
09/08/14 - Met with PEBLO and signed for MEB
09/17/14 - Initial brief with MSC
10/06/14 - VA Pulmonary Function Test
10/09/14 - C&P Exams
11/14/14 - Reviewed NARSUM, opted for Letter of Exception (LOE)
11/18/14 - Turned in LOE
